View Issue Details

IDProjectCategoryView StatusLast Update
0002515Industrial-Craft²E-Net, cabling, storage/transformer blockspublic2019-03-20 01:44
ReporterKrisBigK Assigned To 
PriorityhighSeveritymajorReproducibilityalways
Status newResolutionopen 
PlatformPC, JavaOSWindowsOS Version7
Summary0002515: Splitter cable still stops the whole E-net
DescriptionAfter powering the splitter cable that has 2 cables connected to it, the whole E-net shuts down. De-powering the cable or breaking and replacing the cable re-activates the E-net again. Also, re-entering the game can fix it.
Steps To Reproduce1.Set up the structure in the screenshot. The MFSU on the left can emit EU while the right ones can accept EU. Don't power the splitter cable.
2.Observe that EU is flowing normally from the left to the right
3.Power the splitter cable
4.Observe EU has stopped flowing
5.De-power the splitter cable
6.Observe that everything is normal again.
Additional InformationMod list
DebugServerInfo-1.12.2-1.0.5
industrialcraft-2-2.8.111-ex112
jei_1.12.2-4.13.1.225
LagGoggles-FORGE-1.12.2-4.1
TickrateChanger-Mod-1.12.2
torohealth-1.12-11
TagsNo tags attached.
Minecraft Version1.12.2

Relationships

duplicate of 0002287 new EU stop flowing when destroying one side of a split cable 

Activities

KrisBigK

2019-03-19 22:46

reporter  

2019-03-19_21.08.37.png (132,146 bytes)   
2019-03-19_21.08.37.png (132,146 bytes)   

Issue History

Date Modified Username Field Change
2019-03-19 14:28 KrisBigK New Issue
2019-03-19 22:46 KrisBigK File Added: 2019-03-19_21.08.37.png
2019-03-20 01:44 Chocohead Relationship added duplicate of 0002287