View Issue Details

IDProjectCategoryView StatusLast Update
0001372Industrial-Craft²E-Net, cabling, storage/transformer blockspublic2014-09-01 15:22
Reporterpsusi Assigned ToThunderdark  
PrioritynormalSeverityminorReproducibilityalways
Status closedResolutionduplicate 
Product VersionBuilds for MC 1.7.10 
Summary0001372: Cables not overloading or having loss
DescriptionOn build 0000628, I placed a run of uninsulated tin cable between two CESUs. The 128 eu/p should fry tin, but it didn't. I then placed a very, very long run of copper cable between two CESUs and there was no loss in the energy transfer.
TagsNo tags attached.
Minecraft Version

Activities

Thunderdark

2014-09-01 15:22

viewer   ~0003398

read first http://forum.industrial-craft.net/index.php?page=Index
E-Net is WIP

Issue History

Date Modified Username Field Change
2014-09-01 14:59 psusi New Issue
2014-09-01 15:22 Thunderdark Note Added: 0003398
2014-09-01 15:22 Thunderdark Status new => closed
2014-09-01 15:22 Thunderdark Assigned To => Thunderdark
2014-09-01 15:22 Thunderdark Resolution open => duplicate